Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Chen, Z, Li, H, Ross, A, Khalfan, M M and Kong, S C (2008) Knowledge-Driven ANP Approach to Vendors Evaluation for Sustainable Construction. Journal of Construction Engineering and Management, 134(12), 928–41.

Cheung, S O, Yiu, T W, Leung, A Y and Chiu, O K (2008) Catastrophic Transitions of Construction Contracting Behavior. Journal of Construction Engineering and Management, 134(12), 942–52.

Gil, N, Beckman, S and Tommelein, I (2008) Problem-Solving Base Building under Uncertainty and Ambiguity: Multiple-Case Study on an Airport Expansion Program. Journal of Construction Engineering and Management, 134(12), 991–1001.

Gkritza, K and Labi, S (2008) Estimating Cost Discrepancies in Highway Contracts: Multistep Econometric Approach. Journal of Construction Engineering and Management, 134(12), 953–62.

Grasso, B, Rasdorf, W and Bridgers, M (2008) Nature and Extent of Domestic Construction Program Outsourcing. Journal of Construction Engineering and Management, 134(12), 1002–10.

  • Type: Journal Article
  • Keywords: Owners; Organizations; Life cycles; Capital improvement; Construction management; Contracting;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2008)134:12(1002)
  • Abstract:
    The sourcing of a construction program has always been a fluid process for many construction owners. A construction owner must balance the performance of all construction functions between internal staff and external service providers. Described herein are recent sourcing trends of construction programs identified through a survey of nonresidential construction owners. The survey data is representative of 170 respondents with varying demographic characteristics that account for about $72 billion in annual construction spending. Included are outsourcing trends of specific functions across the construction lifecycle and the sourcing strategy employed for each. A comparison of the outsourcing volume reported and the sourcing strategy employed is presented. A clear relationship between the amount of outsourcing and the sourcing strategy employed for the performance of construction is shown. The paper provides the academic community with new outsourcing data for construction lifecycle functions. It also provides contractors with new information about the current behavior of construction owners while providing owners with a better understanding of the relationship between sourcing and outsourcing.

Hastak, M, Gokhale, S, Goyani, K, Hong, T and Safi, B (2008) Analysis of Techniques Leading to Radical Reduction in Project Cycle Time. Journal of Construction Engineering and Management, 134(12), 915–27.

Leung, M, Chen, D and Yu, J (2008) Demystifying Moderate Variables of the Interrelationships among Affective Commitment, Job Performance, and Job Satisfaction of Construction Professionals. Journal of Construction Engineering and Management, 134(12), 963–71.

Ling, F Y, Low, S P, Wang, S and Egbelakin, T (2008) Models for Predicting Project Performance in China Using Project Management Practices Adopted by Foreign AEC Firms. Journal of Construction Engineering and Management, 134(12), 983–90.

Lu, W, Shen, L and Yam, M C (2008) Critical Success Factors for Competitiveness of Contractors: China Study. Journal of Construction Engineering and Management, 134(12), 972–82.

Sonmez, R (2008) Parametric Range Estimating of Building Costs Using Regression Models and Bootstrap. Journal of Construction Engineering and Management, 134(12), 1011–6.